So this was supposed to be a simple cycle of
Test Cyp: 500 mg/week
Tren Ace: 400 mg/week for 10 weeks
Tbol: 60 mg/daily for last 5 weeks
Based off a 14 week cycle
Now circumstances have made it to where I was only able to use tren for the first 5 weeks, and now I have to use NPP for the last 5. Any thoughts on this? would this is a viable cycle one could normally run, switching compounds halfway through. Both are 19nors and NPP is very versatile I always have a bunch on hand so it can be used for a cut as well as a bulk.
Test Cyp: 500 mg/week
Tren Ace: 400 mg/week for 10 weeks
Tbol: 60 mg/daily for last 5 weeks
Based off a 14 week cycle
Now circumstances have made it to where I was only able to use tren for the first 5 weeks, and now I have to use NPP for the last 5. Any thoughts on this? would this is a viable cycle one could normally run, switching compounds halfway through. Both are 19nors and NPP is very versatile I always have a bunch on hand so it can be used for a cut as well as a bulk.