esarms.com
bannednutrition.com
Results 1 to 2 of 2

Thread: 8 Week Cut Stack / 8 Week Triple Stack Protocol

  1. #1

    8 Week Cut Stack / 8 Week Triple Stack Protocol

    Hi Dylan,
    Thanks very much for all the information and videos you post. The constant influx of information is awesome!

    I am very interested in either the 8 Week Cut Stack (S4 and GW) or the 8 Week Triple Stack (S4, GW & MK2866). I have reviewed all the documentation and have watched all of the videos but could you please help us out with the following questions:

    - Can either of the above two combinations be run during a bridge? If so is their a recommended break after completing PCT before you would commence something like this especially given that I will include both GW & MK2866 in PCT?
    - Is their a recommended PCT after a 8 week cycle like this?

    FYI - I am 34, have completed one only ever cycle of test 250ml/week for 10 weeks and currently weigh [email protected]% am am looking to reduce body fat.

    Thanks very much for your help. Keep up the great work!

  2. #2
    Quote Originally Posted by jobulit View Post
    Hi Dylan,
    Thanks very much for all the information and videos you post. The constant influx of information is awesome!

    I am very interested in either the 8 Week Cut Stack (S4 and GW) or the 8 Week Triple Stack (S4, GW & MK2866). I have reviewed all the documentation and have watched all of the videos but could you please help us out with the following questions:

    - Can either of the above two combinations be run during a bridge? If so is their a recommended break after completing PCT before you would commence something like this especially given that I will include both GW & MK2866 in PCT?
    - Is their a recommended PCT after a 8 week cycle like this?

    FYI - I am 34, have completed one only ever cycle of test 250ml/week for 10 weeks and currently weigh [email protected]% am am looking to reduce body fat.

    Thanks very much for your help. Keep up the great work!
    hey bro...

    `. yes either can be ran in a bridge and you can start your stack immediately upon completion of your pct... if you are continuing with ostarine then you would only be able to run it 8 more weeks but the cycle itself should be 12 weeks, not 8... 8 is going to give you results but its not a full cycle and your leaving gains on the table, which would literally make no sense... yes, a MINI pct is required...

    The triple stack is the most tried and true stack you can run... i would definitely go with that... i will give you some discount links to purchase the stack followed by the layout..


    https://www.sarmsx.com/30-Off/30-off-gw-501516

    https://www.sarmsx.com/30-Off/30-mk-2866

    https://www.sarmsx.com/30-Off/30-s4-andarine

    https://www.sarmsx.com/index.php?rou...38&search=mini

    1-12 S4 50 mg day... split doses... 25 mg in the a.m. and 25 mg 4-6 hours later
    1-12 GW-510516 20 mg day… dosed all at once 30 minutes before workout and non workout days, all at once in the a.m.
    1-12 mk-2866 25 mg day dosed once a day in the a.m.
    9-12 d aspartic acid


    Mini pct 13-16




    clomid 50/25/25/25
    gw-501516 20 mg day

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •